Moglicë hydropower plant
Moglicë hydropower plant is located in the districts of Korçë and Elbasan, in the municipalities of Maliq, Korçë and Gramsh in 阿尔巴尼亚.
-
2020Entered into operation
-
197 MWInstalled capacity
-
450妇女和Annual production
Construction of Moglicë HPP started in 2015, and commercial operations were started in 2020.
Moglicë was the second hydropower plant to be completed by Devoll 水电 Sh.A. (DHP), an 阿尔巴尼亚n-registered company, owned and operated by mg游戏官方网站.
Devoll 水电 builds, owns and operates hydropower plants in cascade along the Devoll River in southeast 阿尔巴尼亚, based on a concession agreement signed between mg游戏官方网站 and the Government of 阿尔巴尼亚.
Moglicë hydropower plant utilizes a head of 300 metres between 650 and 350 metres above sea level. The approximately 167 metres high dam is an asphalt-core rock-filled structure and is one the highest of its kind in the world. The reservoir has a storage capacity of approximately 380 million cubic metres and a surface area of approximately 7.2 square kilometres.
The plant receives water through a 10.7 kilometres long tunnel from the Moglicë reservoir and is equipped with two Francis turbine units and a small unit at the toe of the dam. The installed capacity is 197 MW with an average annual production of 450妇女和.
Moglicë hydropower plant is part of the Devoll 水电 Project which consists of development, 规划, construction and operation of both Banja and Moglicë, with a total installed capacity of approximately 269 MW and a planned annual production of approximately 700 GWh.
The concession agreement also includes an option for a third hydropower plant, Kokel.
公司 | 所有权份额 |
mg游戏官方网站 | 100% |